Site icon Occasional Digest

Southwest Airlines takes first flight with secondary cockpit barrier

Occasional Digest - a story for you

A baggage cart passes by a Southwest 737 Max 8 airliner after arriving from Los Angeles at St. Louis-Lambert International Airport on March 13, 2019. Over the Labor Day weekend, Southwest became one of the first U.S. carriers to take delivery and fly a plane with a “secondary barrier” to protect pilots from cockpit intrusions. File Photo by Bill Greenblatt/UPI | License Photo

Sept. 1 (UPI) — Southwest Airlines has become one of the first U.S. carriers to take flight with an added barrier to protect pilots from intrusions when they exit the cockpit.

Southwest took delivery of the Boeing 737 Max 8, with the added retractable gate-like feature, and put it into service over the Labor Day weekend. The change comes nearly 24 years after the Sept. 11 terror attacks.

“For Southwest this was the right decision,” the airline said in a statement. “We have a robust safety management system that takes a proactive approach when it comes to enhancing safety wherever possible.”

The additional flight deck barrier is designed to prevent cockpit invasions, like those during the 2001 terror attacks when hijackers took control of four jetliners. The secondary gate is closed to provide added protection for pilots when they open the cockpit door to access the lavatory.

Before the barriers, flight attendants have routinely blocked access to the front of the plane, using themselves or a drink cart, whenever a pilot leaves the flight deck. While existing planes cannot be retrofitted with the barriers, newly delivered planes will come with the barrier installed.

Last week, a 2023 Federal Aviation Administration regulation required Boeing and Airbus to begin delivering its new planes with the secondary barriers.

According to the final rule, the new barrier “will be deployed, closed and locked whenever the flight deck door is opened while the airplane is in flight.”

While Southwest has decided to take immediate delivery of planes with the secondary barriers, other airlines have opted to wait until July 2026 after the FAA granted a one-year exemption.

Source link

Exit mobile version